murat dalgıç independent waterproofing consultant

Substrate Preparation

Screed

A thin cement-based layer laid to level a floor or form falls. Typical sand-cement ratios are 1:3 to 1:4; a low water-cement ratio reduces shrinkage cracking.

Facing this issue on site?

Request a technical inspection

Definitions are for general information; product selection and acceptance values are governed by the technical data sheet of the system applied and the project specification.